Mill representation: buying your stainless tube at source

We represent four mills in Thailand, India and Germany. You buy at mill price, with no stockist margin. We handle the specification, production follow-up, certificates, regulatory compliance and transport to your door.

Request a quote

When is mill representation the right route?

When volume, planning horizon and recurrence justify going to source rather than through intermediate stock.

When is distribution the better route?

On an urgent job, a single-unit quantity or an isolated reference, partner stock answers faster than mill production. That is not an admission of a limit: it is the normal division between the two levers — go to source for volume, to stock for immediacy.

See how distribution works →

Which four mills do you represent?

We know their lines, their grades and their dimensional limits — which is what decides which mill suits which requirement.

What do you take on, from specification to receipt?

  1. 01 Qualifying the requirement and drafting the technical specification
  2. 02 Selecting the partner mill suited to the grade and the volume
  3. 03 Mill enquiry and quotation
  4. 04 Technical validation and order placement
  5. 05 Production follow-up
  6. 06 Quality control and collection of material certificates
  7. 07 Checking regulatory compliance (CBAM, origin, Melt & Pour)
  8. 08 Transport and delivery to your door

What incoterms, MOQ and lead times do you work to?

Usually CIF European port, with another incoterm possible on request. No fixed minimum order quantity: it depends on the value of the goods and on amortising the cost of the container and the transport. Typical lead time of a few months, varying with the mill's workload — to be confirmed at quotation stage.

How do you handle regulatory compliance?

CBAM, safeguard quotas and tariff-rate quotas, Melt & Pour traceability, anti-dumping measures: importing directly from a mill outside the European Union creates a regulatory exposure that we track in order to flag the points to check with your customs declarant.

See the steel regulation cluster →

Frequently asked questions

From what tonnage does mill representation make sense?
There is no fixed threshold: it depends on the value of the goods and on amortising the container and transport cost, which has to stay justified against the gain obtained at source.
Can I mix several mills on one project?
Yes: each mill has its own grades and dimensional limits. A project bill of materials can be split across several partner mills according to what it contains.
Are the mills ISO 9001 certified?
All four partner mills are ISO 9001 certified. SPS, as a trading company and commercial agent, is not — see the Quality and certifications page.
What is a typical lead time for a mill order?
A few months, varying with the mill's workload at the time of ordering — to be confirmed at quotation stage.